About Cory Raper

Load Testing

Key Features

  • Test pit provides versatility for any testing scenario.
  • High-load facilities and technology.
  • Convenient location for load-in and out.
  • Complete pull-test capabilities with access to the Gulf Intra-coastal Waterway.

Applications

  • Fixed and floating platforms
  • Marine equipment

Services

  • On-site engineering assistance
  • Vast parts inventory
  • Extensive refurbished equipment inventory

Structural Testing

Sales Contacts

Email +44 1224 290 000



Key Features

  • 8000 ton rig <80MN> tension rig – Primarily used for conducting tension test on TLE tendon connector.
  • 1000 ton rig <9964kN> – 5.1/2″ <140mm> to 7.1/2″ <190mm>
    tubulars testing – Tension 1000 ton/compression 800 ton.
  • 2000 ton rig <19928kN> – 7.5/8″ <194mm> to 30.0″ <762mm>
    tubulars testing – Tension 2000 ton/compression 1000 ton.
  • 2400 ton rig <23914kN> – 7.5/8″ <194mm> to 30.0″ <762mm>
    tubulars testing – Tension 2400 ton/compression 1600 ton.
  • Torque rig – 100,000 ft.lbf – 2.3/8″ <60mm> to 22.0″ <559mm>
    bend rig – 9,000,000 ft.lbf bending capacity – 7.0″ <178mm> to 36.0″ <914mm>.

Applications

  • Performance evaluation of high-pressure casing and tubing
    ISO 13679:2002 <FDIS 2011E> API 5C5-2014
  • Performance evaluation of connectors for use in pipelines
    ISO 21329:2004
  • Wellhead and Christmas tree equipment
    API 6A – ISO 10423:2003
  • Completion – Workover riser systems
    API 17G – ISO 13628-7:2005
  • Subsea wellhead and Christmas tree equipment
    API 17D – ISO 13628-4

Services

  • Tension-compression trials
  • Torsion trials
  • Bend and pressure
  • Combined-load trials
  • Hydrostatic and gas pressure
  • Temperature cycling